Outdoor electrical substation with steel lattice frames, transformers, and overhead power lines.

Start with the map of the evidence.

A guided source map for Speed to Power, AI compute growth, grid reliability, curtailment, storage, virtual power plants, hybrid grid architecture, and policy context.

Library · Resource repository · Community

A first stop before the rest of the resource library.

The map organizes the core sources and topics so you can see the evidence before opening individual resources.

Inside the map

Fast navigation into the cited source library, organized by topic.

Links

60+

Topics

8

Documents, reading lists, trackers, and media assets.

Each resource is organized with context, source notes, topic tags, and a permanent detail page.

Showing resources tagged Policy4 results

Show all resources
Presentation teaser titled Electricity Is Not Just an Input to Our Economy — It Is the Foundation, Walls, and Roof.
Briefing

Resource

Curated

Electricity Is Not Just an Input to Our Economy — It Is the Foundation, Walls, and Roof

Updated Aug 24, 2026 · Julia Frayer · London Economics International · Rethink Electricity Forum at CIGRE 2026

A final paper, presentation deck, and one-page teaser reframing electricity policy around the economic value a reliable, flexible, and inclusive power system can unlock for customers and markets.

Energy abundanceMarket designGrid reliabilityPolicyCapital
Luminary Strategies press release titled Architecting the AI Grid.
Press release

Resource

Library entry

Architecting the AI Grid: Arushi Sharma Frank Unveils Global Flexibility Blueprint in Paris

Updated Aug 24, 2026 · Luminary Strategies LLC · For immediate release · August 24, 2026

Luminary Strategies announces Arushi Sharma Frank's Paris masterclass on ERCOT's Provisional Controllable Load Resource architecture and the release of the PCLR Builds the Moat for AI Loads technical paper.

AI computeSpeed to PowerMarket designGrid reliabilityPolicy
CIGRE Paris Session 2026 title slide for From Administrative Curtailment to Dispatchable Load.
Research note

Resource

Curated

From Administrative Curtailment to Dispatchable Load: The PCLR Architecture

Updated Aug 13, 2026 · Arushi Sharma Frank · CIGRE Paris Session 2026 · Study Committee C5

A CIGRE Session 2026 contribution explaining how ERCOT's Provisional Controllable Load Resource architecture turns conditional large-load consumption into a visible, locational, dispatchable market resource.

Market designGrid reliabilitySpeed to PowerPolicy
Black-and-gold cover for The Journey to Build for AI: PCLR Builds the Moat for AI Loads.
Research note

Resource

Curated

The Journey to Build for AI: PCLR Builds the Moat for AI Loads

Updated Aug 11, 2026 · Arushi Sharma Frank · Luminary Strategies, LLC · July 2026

A technical account of how ERCOT's Provisional Controllable Load Resource framework turns large AI and industrial loads into visible, dispatchable grid resources while preserving firm transmission planning.

Speed to PowerAI computeGrid reliabilityMarket designPolicy

Contribution path

Turn community material into permanent public pages.

Reports, PDFs, decks, videos, links, and source notes can be organized, tagged, and published into the same structure as the repository grows.